Tag: HSR

High-speed rail under construction in Illinois

UPDATE: The City of Carlinville Facebook page provides consistent and timely updates on the railroad crossing closures while the Union Pacific track is upgraded. The City posted photos, too.

If you weren’t specifically seeking out information on high-speed rail (HSR) construction, and you weren’t searching for “track renewal train” and other obscure keywords, you wouldn’t actually know about the status of HSR.

But that’s why you follow my blog – I’ll keep you updated.

Right now, crews are working 10 hour days, working 10 days on, and 5 days off* in Carlinville, Plainview (photo), and Alton, Illinois, to remove existing track and wooden ties and replacing them with concrete ties and continuously welded rail (CWR).

The proof is in the videos, taken only four days ago in Carlinville (map) on October 1, 2010. Watch more videos from PSQLead.

The Harsco Track Technologies Track Renewal Train 909 (TRT-909) does the following:

  • Picks up and carries out of the way old rail
  • Removes old wooden ties with a robot arm
  • Digs up ballast
  • Places new concrete ties
  • Drops in new rail and heats it so it can be “continuously welded”
  • Clamps new rail to new ties

What the beast looks like from afar. Photo of Union Pacific’s TRT-909 in Aldine, Texas, by Matthew Holman.

Thankfully Illinois doesn’t have a growing anti-rail political force like Ohio, California, Florida, or Wisconsin. All of these states have Republican candidates running for governor who say they will stop the train in its tracks. Read more about this unfortunate situation in The New York Times.

*This information comes from a secondary source. I hope to get in touch with someone who knows more about the work.

Departing under the best conditions

I was reading a brochure and timetable (yes, we still call them that) about the TGV Lyria high-speed train service from Paris to cities in Switzerland. Someone left it on a counter at work. It’s in French, and I can read about half of it.

The timetable asked that travelers board the train at least two minutes before the departure, “pour assurer les départs TGV Lyria dans les meilleures conditions” (to ensure the train departs in the best conditions).

Two minutes? You only have to find your train 2 minutes before departure time?

Short story: Back in 1998 (I was 14), my mom and I were traveling from Paris to London on the Eurostar (travels under the English Channel). We’re walking down the ramp to the platform and one of the conductors sees us coming. He yells or motions for us to hurry up. We start jogging down the ramp and jump into the nearest car door.

About 45 seconds later, the train leaves.

A Eurostar train at Gard du Nord. Photo by Marcel Marchon.

More about being on-time:

  • 87.8% of TGV Lyria trains were arrived on time in June 2010.
  • 76.% of flights from 24 reporting airlines arrived on time in the same month. (U.S. DOT)