Category: Urban Rail

Rep. Mica of Florida is confused about how best to support high-speed rail

From Associated Press writer Joan Lowy’s article, “White House doles out $8 billion for fast trains,”

Rep. John Mica of Florida, the senior Republican on the House transportation committee, complained that the Midwest lines awarded grants will achieve top speeds of only 110 mph and were “selected more for political reasons than for high-speed service.”

No, John, the Midwest was selected because it had a comprehensive plan with a regional approach, and with all Midwest states on board a collaborative effort to make Chicago the hub of an expansive network of fast trains that go to many, desirable destinations.

The Midwest was also selected because many of the Amtrak routes showed increased ridership over the past three years (2006-2009), and the ones that received a higher state subsidy or targeted improvements (with funding from the states) that reduced travel time and increased reliability showed an especially high increase in ridership.

And excuse me, Florida received a lot of money for a high-speed train between Tampa, Orlando, and Miami.

View more of my articles on this expanding topic.

High-speed rail stimulus awards coverage and summary

President Barack Obama was in Tampa, Florida, Thursday morning to announce the winners of the high-speed intercity passenger rail funding from the American Reinvestment and Recovery Act (ARRA). The best coverage of this topic is on The Transport Politic.

View a spreadsheet summarizing all of the high-speed rail corridors, their award amount, and investment projects. I prepared this document based on the press releases from the White House Press Office. With these press releases, I also created the construction summary below.

The Acela, a train traveling from Washington, D.C., to Boston via Baltimore, Philadelphia, and New York, is the country’s only high-speed rail, achieving a top speed of 150 miles per hour for only a few minutes. Photo by Jonathan Rissmeyer.

Construction Summary

Construction will occur in the following corridors*:

  • Northeast
    • New track and signals on the New York – Albany – Buffalo corridor.
    • New track on the New York – Montreal corridor.
    • Track will be restored/repaired on the Boston – Portland – Brunswick corridor.
    • A station will be built in Greenfield, MA, a station restored in Northampton, MA, and 11 new miles of track in CT, on the New Haven – Springfield – Burlington – St. Albans corridor.
  • Midwest
    • Two stations will be renovated in Troy and Battle Creek, MI, and a new station built in downtown Dearborn, MI, on the Pontiac-Detroit-Chicago corridor.
    • Also on the Pontiac-Detroit-Chicago corridor, a flyover, approach bridges, embankment and retaining walls will be built in Indiana.
    • Construction in Illinois on the Pontiac – Detroit – Chicago corridor includes the relocation, reconfiguration, and addition of high-speed crossovers and related signal system improvements, rail line additions at two locations, and the creation of a new passing tracks.
    • In Iowa, find four, new, remotely controlled powered crossovers on the BNSF Ottumwa subdivision.
    • Cities in Ohio will see various construction projects on the Cleveland – Columbus – Dayton – Cincinnati corridor, including new stations and upgraded track.
    • Illinois becomes the center of attention again on the Chicago – Milwaukee corridor, with various track and station improvements.
    • New stations will be built along the Milwaukee – Madison corridor, which will also see various track upgrades.
    • Illinois is the center of the Midwest rail network. The third largest award in this grant program goes to the Chicago – St. Louis corridor, for upgraded track, signals, and stations, installation of positive train control, and some CREATE projects to reduce congestion in and outside of Chicago.**
    • The St. Louis – Kansas City corridor will see upgraded bridges, crossovers, and improved grade crossings.
  • Pacific Northwest
    • On the Seattle – Portland corridor, expect construction of a bypass track, grade separations, the addition of Positive Train Control, and seismic retrofits to King Station in Seattle, WA.
    • The Portland Union Station will be upgraded.
  • South and Southeast
    • Between Fort Worth and Austin, new signals at grade crossings will be installed.
    • The Charlotte – Raleigh corridor will receive track upgrades.
    • Four new crossovers will be constructed in the Raleigh – Richmond corridor.
    • Between Richmond – Washington, D.C., trains will travel over 11 new miles of high-speed track
  • California
    • The California High Speed Rail Authority receives the largest chunk to construct track, signals, and stations.
    • On the Pacific Surfliner Corridor (San Luis Obispo – Los Angeles – San Diego), new track and crossovers will be constructed.

View on Google Docs or download an Excel file.

*This construction summary is about as complete as the press releases from the White House. I reviewed each press release and copied the information that indicated where construction or upgrades of new or existing project components would actually occur. I excluded planning, environmental impact statements, engineering, and design components of the above projects. I compiled the most important information from the White House press releases into a spreadsheet.

**UPDATED: For more CREATE and Englewood Flyover information, which was funded at $133 million, see page 2 of the Federal Railroad Administration’s summary handout (PDF) and this discussion on Railroad.net.

Thursday is a big day for high-speed rail in America

UPDATE 2: The Transport Politic has the most detailed and comprehensive information on high-speed rail project/corridor funding, a better looking map than Ray LaHood’s map on LaHood’s blog. The White House Press Office posted separate press releases for each project here.

UPDATE: Chicago Business (Crain’s) says Illinois to get $1.2 billion for high-speed rail projects, including money to build the Englewood Flyover connection (Project P1, see map), a major CREATE component (read more: PDF). CREATE is a multi-agency program to reduce the bottlenecks caused by mixing passenger and freight trains and at-grade road crossings.

Tomorrow, President Barack Obama and Vice President Joe Biden will travel to Tampa, Florida, to announce the thirteen corridors winning a portion of $8 billion in funding for high-speed passenger rail projects.

Infrastructurist predicts four winners.

An Amtrak train heads south from Chicago Union Station. If Illinois receives stimulus funding for high-speed rail, we may see some faster locomotives and some new track emerging from the Chicago South Loop train yards.

Vice President Biden, President Obama, and Department of Transportation Secretary Ray LaHood (from Peoria, Illinois), announced the high-speed passenger rail plan for the United States in Washington, D.C., in April 2009. Photo by Scott Bernstein of the Center for Neighborhood Technology in Chicago, Illinois.

One of the winners Infrastructurist predicts is the State of Illinois on behalf of a project to upgrade the tracks and rolling stock for the Amtrak lines Lincoln Service and Texas Eagle that run from Chicago to St. Louis. This is by far the state’s most prosperous route. The Illinois DOT has increased the subsidy to this route, increasing the frequency of service. In response, ridership has grown year over year over year (although the gain from 2008 to 2009 was only 6 percent).

Will Americans soon travel with more convenience in the coming decade?

Circle Line brings out the public’s comments to the CTA

The public should always be involved in city and community planning. It can be a difficult exercise, though, but morally, and legally, we must do it. I got my own experience with dealing with the public by setting up and running, from the venue to the content, a public meeting about bicycling in Chicago in summer 2009 (reports and documents, photos).

Participants at the Mayor’s Bicycle Advisory Council public meeting on Wednesday, June 17, 2009, discuss relevant bicycling topics.

What’s unfortunate, though, is that public participation tends to turn into meeting theater.

The Chicago Transit Authority (CTA) has just released the public comments from the third “screening” of the Circle Line Alternatives Analysis study. Screen 3 presented the Locally Preferred Alternative (LPA), including route alignment and new station locations. I’ve collected a handful of some of the irrelevant or humorous comments members of the public submitted to the CTA after the open houses in September 2009. I’ve also included a selection of thoughtful, serious, and relevant ideas and questions (these ideas comprise the majority). Download the entire collection.

Irrelevant

These comments are recorded by the CTA study team, but not addressed and thrown in “Topic Area 23, do not pertain to the Circle Line.”

  • Nobody builds 1890s technology like Chicago!
  • What would Daniel Burnham think of this “LPA?
  • The connection for regular service to the Old Orchard Mall has my support.
  • These comment cards are meant to constrain public debate. RTA does not use these. Why does CTA need to control the public? [Note: If the commenter feels the need to say this, a comment card is the wrong outlet; also, an open house is not an opportunity to debate anything]
  • What is this “future plan? [Note: It seems that the commenter is unsure of their presence at the open house, or they don’t understand that the Locally Preferred Alternative includes only a small part of the Circle Line vision]

Serious

  • Tonight I was handed a flyer from LVEJO claiming that MidCity is cheaper than Circle even though it is 20 miles longer. CTA’s study says the opposite. Which one is more accurate? [Note: I would also like to know the answer]
  • The material provided on the CTA web site (the presentation slides and display boards) do not seem to be sufficient for public comment except at the most superficial level. Especially for those citizens who were unable to attend one of the three public sessions, the web materials are all that are available, and I do not believe they are adequate to meeting your requirements for public participation.

Common Topics

While the team who puts on the public meetings categorizes the comments into distinct topic areas (in order to more quickly address them), there are at least three major topic areas I saw prudent to discuss here. Read these after the jump. Continue reading

Update on BikeLink electronic bike lockers

Two weeks ago I wrote about BikeLink electronic bike locker from eLock Technologies in Improving bike access to airports. I discovered some new information about the lockers about changes being made to a bike parking facility in San Francisco, California. Later, after watching a Streetsfilm video on the novel system, I realized I mistakenly identified the electronic access method.

BikeLink news in San Francisco

In October 2009, the Embarcadero BART station switched from a valet-based bike parking facility to using a BikeLink-controlled cage. The San Francisco Examiner thinks the lack of a hired attendant will deter people from parking here. The reason was cost: The labor needed to staff the cage cost $3.22 per bike while the electronic system costs only $0.42 per bike. Members pay only 3 cents per hour between 8 AM and 8 PM, and only 1 cent per hour at all other times.

The writer found three people to go along with the story and question the converted facility’s safety/security.*

The article doesn’t give up further details, but Alameda Bicycle (a local bike shop) fills in the missing information:

  • New members sign up and pay for an access card from BikeLink online or one of several physical locations.
  • The member opens the cage with their card and finds a place to park inside the cage. This is the sign-in.
  • The member locks their bike (there may not actually be an object to which one can lock their bike) and removes any easily-removed parts (like lights and bags) and exits the cage.
  • The member then exits the cage and inserts their card into the read to perform the sign-out. If 10 minutes has passed and the member has no signed out, an audible alarm will go off, and the cage operator (Alameda Bicycle) will be alerted.

There are some other rules that apply to cage use. You have to also register your bicycle so that the operator knows which bicycle belongs to which member so they can better track misuse of the facility. The operator will conduct random checks to verify this. Because of the way this electronic cage works, members have an incentive to not let non-members into the cage.

*The San Francisco Examiner article went so low as to publish this worthless quote from an individual, “I have plenty of cards already in my wallet,” said E.M., who takes his bike from Richmond to the Embarcadero station daily. “Why do I need another one for parking my bike?” The benefit of having a card to lock your bike is that you can use the same card to securely lock your bike at lockers up and down the state.

Smart card, not magnetic stripe card

I wrote that the “debit card” is a magnetic stripe card (like a credit card or transit fare card), but instead is a smart card, with the member’s data and current balance stored on an integrated circuit chip. Occasionally, some people equate smart cards with proximity, contactless, or RFID cards. It seems more popular though to only identify a smart card as one that has a gold-plated chip visible on the front side. These are more popular in Europe and Asia.

Streetfilms (a sibling of Streetsblog) visited Oakland and El Cerrito, California, in 2007, to show how they work and how they compare to traditional, leased lockers (short story: electronic lockers are on demand and can serve multiple, unique users in a day or week, while the leased locker has one unique user). Watch the video: