Category: Urban Rail

Non-auto construction projects in Chicago

There are 17 construction projects listed here and none are about automobiles. Additionally, there is information about 2 studies for bus rapid transit-like projects.

Download all of these into Google Earth with this KML file.

A couple of these projects are being held up by the current Illinois roadway construction workers’ strike. UPDATE: Apparently a deal has been reached to end the strike.

Streetscapes

  • Blue Island/Cermak – I wrote about this project at length in October 2009. Construction should begin as soon as the strike is resolved. CONSTRUCTION UPDATE, 10-21-10: Bioswale, or creek, is mostly complete at Benito Juarez Community Academy (BJCA). Plaza with permeable pavers, and sheltered bike parking also complete. Photos here.
  • Congress Parkway – Full details and renderings from CDOT (PDF). Project should begin in 2010 and will narrow lanes, reduce number of lanes, straighten lanes (no more mid-intersection lane shifts), widen sidewalks, and improve crosswalks. Will add a lot of landscaping and unique and decorative lighting.
  • PROPOSED: Lawrence Avenue between Ashland and Western. Reduce the number of travel lanes from four to three, adding bike lanes and a center turn lane. Project limits include the rebuilt Ravenswood Metra station at 1800 W Lawrence. More details on Center Square Journal. Construction wouldn’t begin until 2011.

Transit

  • Morgan/Lake Green and Pink Line CTA station (new) – Details and renderings from CDOT (PDF) – Overview from Chicago Transit Authority – Tons of bike parking included at the beginning, how it should be. Construction should start this year. To better serve the West Loop area, where more people are moving to, but also has lots of existing businesses.
  • State/Grand Red Line CTA station renovation – Construction should finish this year.
  • 35th/Federal Rock Island Metra station (new) – Construction started in 2010.
  • LaSalle/Congress Intermodal Center – To improve connection between buses and the LaSalle Metra station. Mentioned in the Congress Parkway streetscape presentation (PDF).
  • Wilson Red Line CTA station renovation – Down the street from a new Target store that opens this weekend and hundreds of brand new housing units in the Wilson Yard development. Will use TIF funds from the Wilson Yard district. Overview on CTA Tattler.
  • Ravenswood Metra Station – A popular station on the Union Pacific-North line (to Kenosha). Will add longer and sheltered platform and become accessible. Details with Chicago Square Journal.
  • FLOATING: New Green Line CTA station at 18th or Cermak. Roosevelt station serves three lines. South Loop neighborhood fast growing. The new station would improve transit access to McCormick Place (at least if built at Cermak). Follow the Chicago Journal for more news on this topic.

morgan cta station rendering

Rendering from the Chicago Department of Transportation (CDOT) showing context-sensitive design. See the full presentation (PDF) for architectural influences.

Bridges

  • Halsted Street over North Branch Canal of the Chicago River. Replaces 99-year old moveable span with fixed span. No information on how it will accommodate the Halsted Street bike lane. Construction to begin in 2010 (PDF). CDOT project number 74062.
  • Navy Pier Flyover – Elevated section of the Lakefront Trail to bypass current bottleneck where the Lakefront Trail currently enters the Lake Shore Drive bridge over the Chicago River and DuSable park. Details from CDOT presentation on July 15, 2010.
  • PROPOSED: 35th Street pedestrian bridge over Metra/Illinois Central tracks and Lake Shore Drive to lakefront and Lakefront Trail. Bridge will be self-anchored suspension, like the new Bay Bridge from Oakland to San Francisco. Overview on Burnham Centennial (drawing says 2007).

Rendering of the Navy Pier Flyover as it travels over the Lakepoint Tower condominiums as seen at the Cities and Bicycles forum with David Byrne in June at the Chicago Cultural Center.

Other

  • Various CREATE projects. All CREATE projects involve railroads in some way and most projects will construct grade separations. I’ve written about CREATE.
  • The Chicago Park District opened a new beach at Oakwood/41st Street this year. The grand opening for the beach house happened this past Saturday.
  • The Chicago Park District is currently building a harbor and marina immediately south of the 31st Street beach. The Public Building Commission of Chicago has the details and renderings. AECOM, the architect of record, produced these concept drawings (PDF). It appears how bike riders currently navigate the intersection at the entrance to the beach will change to be a little more normal and not force bike riders on the sidewalk. It’s unclear how many new parking spaces are being created along the lakefront – the fewer the better. The concept plan shows a new parking lot on the west side of the railroad tracks, a design I wholly support.
  • FLOATING: Luann Hamilton mentioned at the Cities and Bicycles forum with David Byrne in June that CDOT was thinking about a buffered bike lane on Wells Street.

31st street harbor concept rendering

Rendering of the 31st Street harbor concept plan. As seen in the contractor’s presentation to the Public Building Commission of Chicago.

Related

Although not construction projects, two additional proposals merit your attention. The Chicago Department of Transportation and the Chicago Transit Authority each received grants this month to study and develop two corridors with bus rapid transit-like features. CDOT’s plan is to develop a priority bus lanes for up to seven routes between the Metra stations and Navy Pier and North Michigan Avenue (the Miracle Mile). Thank you to Kevin Z for the update.

CTA’s grant money is to fund the development of a speedy bus service from the southeast side to the West Loop via the north-south Jeffrey Avenue.

Bikes and transit – share your knowledge

UPDATE: Why bikes and transit go together (PDF) – read this brochure from the Federal Transit Administration (FTA).

While you’re reading up on the 80+ comments on the story about some Seattle bike riders suing the city, I want to take this opportunity to again promote the Bikes and Transit group on Flickr. The group’s purpose is to document interactions between bicycle riders, bikes, and transit vehicles, both buses and trains. The definition of “interaction” is quite loose.

Photo from the San Francisco Bicycle Coalition taken one 3rd Street during the May 24, 2010, Sunday Parkways.

Many times, bicycle riders are also transit users. If not, they’re riding in streets shared by streetcars, light rail, and buses. The pool of photos from around the world can help us learn about practices in other countries. Or we can find out that fat bike tires won’t fit in many bus-bike racks (see photo below).

Richard Masoner points out that 2.6 inch wide tires don’t fit into the bike rack on Santa Clara Valley Transportation Authority buses, using the Sportworks Veloporter racks (common to bus operators across the United States).

Add your own photos! Or link me and I’ll invite your photos one by one.

A diversity of transportation

Portland is a great city to visit to see a large variety of small-scale transportation, including facilities and accommodations for non-motorized and human-powered transportation, or out of the ordinary modes like an aerial tramway (also called a cable car). The photos are from my trip to the Pacific Northwest in April 2010.

You pay to go up. It’s free to come down.

Portland also has traditional transportation modes like streetcars and light rail.

What to see and ride in Portland (I rode or saw each of these):

  • TriMet MAX (Metropolitan Area Express)
  • Portland Streetcar
  • Portland Aerial Tram
  • Bikeways, including bike lanes, marked shared lanes, bike boulevards (now called neighborhood greenways), and cycletracks
  • Bike parking
  • Lift and moveable bridges – the Steel Bridge carries light rail, railroad, automobiles, pedestrians, and bicyclists; the Hawthorne is the most popular bridge for bicyclists. I made sure to cross over the Broadway, Hawthorne, Steel, and Burnside bridges. I missed crossing on the Morrison bridge. I guess I will have to take another trip!
  • Bus – This is standard fare, nothing unique about it in Portland compared to other cities.

Bicycles make up 21% of all traffic on the Hawthorne Bridge. See the rest of my “Transportation in Portland” photos.

Posts I liked today

It’s been like two weeks since I last posted. That’s because my master’s project is due in 25 days. I have to finish it.

I still read the news while I’m busy, though!

  • Infrastructurist: How to Make High Speed Rail Fail: Don’t Connect the Lines. Apparently, no one’s taking the lead in Florida to ensure the high-speed rail line (Tampa to Orlando, which received $1.25 billion) will connect with the not-yet constructed SunRail commuter/regional rail line around Orlando.
  • BikePortland: Editorial: When it comes to family biking, size matters. Families use bikeways and streets differently than individual riders and even other grouped riders. How can we plan bicycle-related street upgrades to better accommodate family cycling?
  • Wall Street Journal: Surface Improvements. The New York City Department of Transportation did a great thing when it reallocated street space on Broadway to improve conditions for pedestrians, tourists, residents, and bicyclists. The eight month experiment is now permanent and the City is holding a competition to replace the semi-temporary facilities (epoxy gravel, discount store seating) with more permanent furniture.

Photo: Families in Portland, Oregon, ride together to a nearby event on a recent weekend. Photo by Jonathan Maus.

High-speed rail wrap-up

So let’s recap the week of high-speed rail announcements.

On Wednesday (1/27), President Obama in his State of the Union speech talks about how $8 billion in funding for high-speed intercity passenger rail (HSR) will be a major jobs creator.

Photo: Tri-Rail is a commuter rail service between Miami, Fort Lauderdale, and Palm Beach. In five years, a high-speed train will whisk travelers between Tampa and Orlando. The hope is that a second link between Orlando and Miami will come afterwards.

The next day, in Tampa, Florida, he announced the winners of the $8 billion dollars of funding. Actually, the White House Press Office “leaked” the press releases the night before.

So what did I do for “high-speed rail week”?

I wrote a few articles and created a couple summaries:

If you want to read some more opinions about this part of the American Reinvestment and Recovery Act (or stimulus), check out these articles I’ve selected: