Category: Bus

Day two in Zurich: Combine transit and museums on a single pass

Zurich, Switzerland

I was taking pictures of the tram and when I got home I saw that all three people were staring at my camera. At Bellevue in Zurich.

The post for day 1, Friday, when I went to Mount Rigi, hasn’t been written yet. 

Today was a busy day, which is expected when you travel Steven Vance-style: efficiently (meaning you see a lot of stuff without wasting any time), alone, with a very good sense of what you want to do, where they are, and how you’ll get around.

I’m staying at Hotel Bristol, which came up in an Orbitz search as being a decent place less than $100 per night – that’s hard in Zurich, and even harder if you want a place near the Hauptbahnhof (Hbf). I knew that’s where I would be coming and going a few times to get to Lucerne, the mountains, or to buy cheap (relatively) dinner.

This morning, after eating a continental breakfast in the hotel, I walked a couple of blocks from the hotel to the Hbf – I’m measuring blocks in a Chicago-sense. It was about 4-5 minutes to the nearest station entrance to buy the ZurichCard.

Getting the card was a no-brainer because for 24 CHF (Swiss Francs, about $25) you get a 24-hour public transit card and free entry to dozens of museums. It includes the city zone and the adjacent zones, including the airport. I have to leave for the airport tomorrow by 10 AM and I validated the card at 11 AM so I’m covered there.

After checking out and riding the city’s two funiculars and single rack railway, I visited the tram museum and national museum (Landesmuseum). Add to that the dozens of trams and buses I rode to reach the hill transport and two museums.

Consider that the cost of the train to the airport is 6.40 CHF, the tram museum is 12 CHF, and the Landesmuseum charges 10 CHF, I’d say I got more than my money’s worth.

What’s really great about the ZurichCard is that you can purchase it at any of ticket vending machine, including the ones labeled “SBB CFF FFS”* that also sell national railway and supra-regional tickets. You have to remember to validate the card right before your first use, either at a ZVV (Zurich regional public transport union) ticket vending machine.

My first transit trip this morning was on a fantastic double-articulated bus. That means it has three sections with five doors! These buses are only used on routes 31 and 33 in the city center, and they’re electric and silent, running on overhead trolley wire. The bus has the same priority and comfort as a tram, and multiple screens attached to the ceiling showing the next stop and its connections (transfers).

Zurich, Switzerland

The front two sections of a bi-articulated bus. It’s normally not possible to bring a bike on a bus or tram in Europe, except when the bus has been specially outfitted for the bike to be on the inside. Buses in Europe aren’t allowed to have bike racks on the front.

The tram system in the city center is the perfect complement and support for having so little driving here. Some of the streets restrict driving, and other streets have only a single lane in one direction, or just two lanes, one in each direction. Many of the major intersections within a mile of the Hbf surprisingly have no traffic controls.

Trams and buses load and unload passengers very fast because you can board through any door. “Winter mode” is enabled on many of the vehicles to keep passengers already on board more comfortable by opening doors at the stop only upon request (you push a button on the door).

Streetfilms published a video in 2014 discussing how the city administration has capped the number of parking spaces across the city: if a new parking space is built, a parking space has to be removed in the city center.

Driving in the city center is thus primarily for leaving your parking space for elsewhere in the city or region, or the reverse. Trips are extremely convenient by tram or trolley bus.

Motorists are obliged to stop for people who want to cross the road in zebra crossings, and trams which are turning across the lanes. Then, unless a road sign or marking dictates the priority of a lane, the rule “yield to the motorist on your right” reigns.

I never waited more than 7 minutes for a tram (I know because the countdown signs never exceeded 7 minutes for the route I was going to ride) and the average was probably closer to 4 minutes. It seems that a majority of the time trams run in exclusive right of way and traffic signals are set up to prioritize their movement.

Transit signal priority isn’t a given in all cities with trams; in Amsterdam and Budapest it seemed the tram waited just as long for a “green” light as adjacent, same-direction motorists did.

At the tram museum I talked to a staffer there who was pointing out features in a model created by a city task force which was investigating a potential U-bahn (underground) system for Zurich. He said that a couple of years ago the museum hosted an event to talk about whether the city was better off without the system.

The consensus amongst the attendees was that the city was indeed better off without a subway because the trams have a higher frequency than what the subway would have had. Another point made was that the connections between trams are easier and faster than between other modes.

Nevertheless, a few underground stations were built, but they aren’t subways. Two tracks, 21 and 22, carry the two routes of the Sihltal Zürich Uetliberg Bahn (SZU), One goes up the Uetliberg mountain in the city and the other serves the Sihl valley suburbs. There are also three underground tram stations away from the city center on line 7.

Traffic on the local transit was lighter than yesterday. Many riders I saw today were headed to a hill to go sledding. It might also be a coincidence that I rode all three hill-climbing funicular and rack railway lines, as well as the train that goes up “Mount Zurich” (870 meters; its real name is Uetliberg).

The Dolderbahn heads up the hill from Romerhof to the Dolder recreation area. At least half of the passengers today were children going with their parents and friends to sled down a hill there.

The Dolderbahn is a rack (cog) railway that heads up the Adlisberg mountain from Römerhof to the Dolder recreation area. At least half of the passengers today were children going with their parents and friends to sled down a hill there.

The last word on Zurich: It’s very expensive to eat here. I paid 11.50 CHF (about the same in USD) for a “döner box” which is something I paid about $5 in Rotterdam. A döner box is fast food. The cheap beer that went along with it was $5, which I could probably get for less than $2 in Rotterdam.

* “SBB CFF FFS” is a set of three acronyms that when expanded mean “Swiss Federal Railways” in German, French, and Italian, respectively. It’s normally abbreviated to SBB – German is the most commonly spoken language in Switzerland. Each of the acronyms plus dot “ch” has its own website that loads the organization’s website in the respective language.

Jefferson Park station renovation highlights train station planning deficiencies

Jefferson Park train station rendering

Jefferson Park train station rendering from the City of Chicago. The only difference you see is canopies. What you don’t see is a walkable connection ut thisetween shops southeast of here and the train station – they’re separated by a strip of parking.

Plans for the renovation of the Jefferson Park CTA station are illustrative of the City’s failure to think deeply about how to design the projects that is funding in a way that maximizes potential for residential and commercial development around train stations.

The changes proposed for one of Chicagoland’s most important transit centers are weak. There’s no development plan, or any kind of neighborhood plan or “Corridor Development Initiative” for the Jefferson Park transit center.

Current city policy identifies train stations as optimal places to build new housing and commercial uses.

Without challenging the design to respond to this policy the transit center will continue to use neighborhood space inefficiently and doesn’t respond to demands from residents to improve pedestrian and bicyclist safety and increase economic development.

Judging by the renderings, nothing is changing at the Jefferson Park Blue Line station (4917 N Milwaukee Ave). All of the improvements save for the canopy are invisible in this rendering. The CTA’s list of improvements reads like the superficial makeover that many stations got in the Station Renewal program almost three years ago, a stopgap measure until Your New Blue could begin.

There will be LED lighting, new paint, new escalators and stairs, new paving, and a new canopy. Only a few of those things make the station easier to access and use.

Jefferson Park is a major asset to the neighborhood and the city. The station serves CTA trains, Metra trains, CTA buses, and Pace buses to Chicago’s suburbs. The CTA’s September 2014 ridership report [PDF] said there are an average of 7,420 people boarding the Blue Line here each weekday, a 0.1% increase over September 2013. It’s the busiest Blue Line station outside of the Loop and O’Hare airport.*

On Twitter I said that the station should be surrounded by buildings, not bus bays. I’m not familiar with how many routes and buses use the station daily, and I’m not suggesting that space for buses go away. I’m challenging the Chicago Transit Authority and Mayor Rahm Emanuel to come up with a better plan for vehicle and pedestrian movements, and to start welcoming new development.

I pointed out the new Wiehle-Reston Silver Line station in Virginia where a residential building was constructed atop a bus bay (where I transferred from the Washington Flyer bus from Dulles). A plaza connects the bus bay to and apartment lobby and the Metrorail station.

Bus bays under an apartment building in Reston

The bus bay at the Wiehle-Reston Silver Line station in Reston, Virginia, is under an apartment building and plaza linking it to the Metrorail station.

The Metropolitan Planning Council conducted a consultation for the Logan Square Blue Line station – Your New Blue will make upgrades here, too – and the next door city-owned parking lot. Their consultation involved 700 people to decide what development at this station should look like. Their desires were pretty specific: there should be affordable housing, but not any higher than six stories.

The current policy, enacted as an ordinance and expressed in other city documents, allows developers to build more units in the same plot and save them and their tenants money by building less parking. But this policy is insufficient in that has no design review or public consultation attached. It also provides no zoning recommendations to expand the number of places to which it can apply.

A development plan, for which the CDI serves as a good, starting model, would bring residents – and people who want to live in the neighborhood – to discussions about if and how the neighborhood should change. It would hook into another city proposal, from the Chicago Department of Transportation, to build protected bike lanes on Milwaukee, but which ultimately failed. The process would probably uncover latent demand to build new housing in the neighborhood that’s stymied by incompatible zoning.**

The city’s recent choices for development and (lack of) urban design at this station as well as across from the Halsted Green Line station in Englewood where the city is selling vacant land to build a Whole Foods-anchored strip mall demonstrates how little deliberation there is in maximizing transit-oriented development, or TOD.

Their suburban forms are the antithesis of how we should be designing the stations and their environs – they should have higher densities and walkable places.

* Metra has published its 2014 station-level counts! This station had 599 daily boardings, yet not every train stops here. The Union Pacific Northwest (UP-NW) line that stops at Jefferson Park saw a 3.8% increase in ridership [PDF] from January to September 2014 versus the same period in 2013.

** There are no parcels near the Jefferson Park transit center that allow the transit-adjacent development ordinance to take effect; developers have to go through an arduous and sometimes costly process to persuade the alderman to change the zoning. The ordinance only affects Bx-3 districts (where x is 1-3 and -3 is the allowable density identifier).

Exploring Pace’s locations for mysterious Arterial Rapid Transit bus stations on Milwaukee Avenue

intersection of Touchy and Milwaukee in Niles

This is the semi-urban scene at Touhy and Milwaukee Avenue. The police station is ahead on the right. The water fountain (described below) is behind the bus on the left. There are multi-unit buildings to the left and across the street on the right. Image: Google Streetview

Update, Jan 21, 2015: Pace unveiled their plan for ART and their request to Congress to make the ART plan a project of regional significance to attract more funding.

Pace, the suburban bus operator in Chicagoland, is constructed an Arterial Rapid Transit bus route on Milwaukee Avenue from the Jefferson Park Transit Center in Chicago – a busy intermodal station where Metra and CTA buses and trains stop – to Golf Mill Mall in Niles. Both of these are major transfer hubs.

I’ve never looked into ART bus systems before but it seems to resemble what many call BRT Lite. Pace has minimal information on its website. Daniel Hertz, notable bus transit supporter, pointed me to an RFP [PDF, 10 MB] that describes the location and scope of Pace’s first (of many) ART corridors.

The RFP describes this project as one of 24 corridors outlined in its Vision 2020 document “to provide a regional network of premium transit services”. It appears that premium is relative and that bus riders will have a more comfortable and easier-to-find bus station at which to wait – bus travel time will not change.

I’ll try to paint you a picture of the built environment going north to south at the eight intermediate stops.

Dempster Street, Niles

Milwaukee has six general purpose lanes here and Dempster has six, four of which go under Milwaukee; buildings are set back far from the curb and land uses are low-density and optimized for arriving in a car

Main Street, Niles

Milwaukee has four general purpose lanes and one wide parking lane here; Main is a two-lane street; there is some residential on both streets

Oakton Street, Niles

Milwaukee and Oakton both have four general purpose lanes

Harlem Avenue, Niles

this intersection has decades-old buildings that have limited parking up front and smaller setbacks; there’s a Dunkin Donuts here with a drive-through between the building and the sidewalk (that’s novel but awful)

Touhy Avenue, Niles

This intersection may be the most urban, despite its immense size. Touhy has six lanes here meaning pedestrians must cross 100 feet of pavement in a faded, stamped-asphalt crosswalk; there’s a massive police station building on one corner, a large multi-unit building on another, a strip mall that actually has entrances onto a  sidewalk plaza instead of just in the parking lot behind it (the Subway and Starbucks here even have sidewalk cafés), and a fountain rounding out the junction – I recommend demolishing the fountain in favor of selling the land to a developer who can build more of the multi-unit buildings like the ones behind the fountain while also getting rid of the pointless cul-de-sac

Highland Avenue, Chicago

This is one block south of Devon Avenue, in Norwood Park. There’s a conventional bike lane here but the Chicago Department of Transportation has noted that there just enough cars that reducing the number of general purpose lanes from four to two – part of a road diet that would add buffered or protected bike lanes – but many residents don’t support the project so the alderman has decided against supporting it.

The land use and design is a blend of what came before it and what’s typical in Chicago: old buildings up against the sidewalk, closer-built single-family homes, some multi-unit buildings.

Austin Avenue, Chicago

Like Highland but now seeing fewer surface parking lots.

Central Avenue, Chicago

Like the rest of the junctions we’re still in motordom; four of the six “first in line” motorists seen in Google Streetview are blocking the crosswalk while waiting for the light to turn green.

About the stations

Pace has established a $6 million budget for the station construction. The station platforms will span 40 to 110 feet, a raised platform that’s 12 inches tall, a new shelter, real-time bus tracker*, a common vertical marker, a single bike rack to hold two bicycles, and associated roadway, curb, and drainage improvements.

It’s unfortunate to learn that the RFP mentions that shelters in Chicago may have to be the insufficiently designed kind JCDecaux operates for the city as part of a very long advertising contract.

Pace ART station design

Pace shows a rendering mocking up a typical station design. I’m concerned the handrail at the rear of the bus will preclude using longer buses in the future, but that would be the least of Pace’s worries.

* It appears that Pace will be using NextBus‘s real-time arrival information services (page A-6 of 14); they’re a company founded in 1996 and now owned by Cubic, which operates Ventra.

The City of Chicago should implement filtered permeability immediately at Green Street and Milwaukee Avenue

This is not a bikeable block

The multiple threats to bicyclists, to pedestrians, and to motorists, are pervasive in the depicted scene. There is low visibility for turning motorists which in turn causes them to encroach on the right of way of other street users, including other motorists, bicyclists, and pedestrians.

This single image shows everything that is inefficient and dangerous to bicyclists and motorists about the intersection between north-south Green Street and diagonal Milwaukee Avenue in River West. Motorists should be physically blocked from entering or exiting Green Street at this point because of the danger inherent in the current intersection design. The block of Green Street south of Milwaukee Avenue is so insignificant to the driving network that no other design intervention should be implemented.

The situation depicted in this photograph demonstrates why the City should implement filtered permeability and close this entrance of the Green Street/Milwaukee Avenue intersection to motor vehicle movement. While motorists would be barred from entering or exiting Green Street here bicyclists would still have access to Green Street as part of the low-stress bicycling network of which Green Street is a part, between Milwaukee and Van Buren Street in Greektown.

I first wrote about this problematic intersection in June on Streetsblog Chicago and it remains an issue. One of the two motor vehicles ahead is blocking part of the bike lane while the second threatens to enter it. The bus on the left prevents the bicyclist in the bike lane from maneuvering around either vehicle. The photo below shows the situation from a different angle, that of the motorist wanting to turn left.

The vehicle operator on the left – a bus driver, in this case – has stopped the vehicle because they can occupy the intersection with the vehicle, or leave it open. Essentially, the bus driver has stopped to “let” the motorists on Green Street proceed across Milwaukee and further north into Green Street or turn left onto Milwaukee. Their movements would, again, put the bicyclist in danger, and put themselves and other motorists in danger because they are making nearly-blind turns into faster moving traffic.

The threats to the motorist are as limitless as the ones to the bicyclist (although the bicyclist will experience much greater injury if the threat is realized). As the motorist is paying attention to other motor vehicle traffic the bicyclist is coming down this bike lane – yep, I took the photograph – and is additionally obscured by the line of parked cars on the bicyclist’s right, and is in the shadow of the bus and the buildings. It’s like there’s a perfect storm of blind spots.

The quickest way to implement a system of filtered permeability and raise the significance and safety of the Green Street and intersecting Milwaukee Avenue blocks within the low-stress bicycling network would be to install a series of large planter boxes that prevent motorists from entering or exiting Green Street but allow bicyclists to filter through the planters.

And skip any traffic impact study. Not a single parking space will be lost or be made inaccessible with the implementation. A traffic study is not an experiment, but has practically been a foreboding document that has only ever said “things will be different”. (A good plenty of them have also suggested adding multiple $300,000 traffic signals.)

I read on Streetsblog USA recently about Pittsburgh’s new protected bike lanes:

“Instead of asking people to judge the unknown, the city’s leaders built something new and have proceded to let the public vet the idea once it’s already on the ground.”

Chicago maintains a Silver bike-friendly commenting ranking, yet my initial analysis shows that our metrics are below average among other Silver communities after which I’m led to believe we’re undeserving of the medal. Safety is a citizen’s number one concern when considering to use a bicycle for transportation and it will take an expansion of the low-stress bicycling network – currently not a priority – to deserve the current ranking or achieve anything higher.

Two bicyclists take different routes around this driver blocking the bike lane with their car

This photograph depicts a nearly identical situation but from the perspective of the motorist on Green Street approaching Milwaukee Avenue. Two bicyclists have taken two routes around the motorist blocking the bike lane with their vehicle.

What if Metra employees were late to work as often as Metra passengers?

trainmageddon

A malfunctioning Metra Electric train in January. Photo by Eric Rogers.

It was a big deal to news media this morning when new Metra CEO Don Orseno reported at an Illinois House mass transit committee hearing that the commuter-focused rail system experienced a 30% on-time rating in January, when the “polar vortex” hit. (Apparently polar vortex is not an event that happens to a place, but is the name of a climate pattern that’s always there hovering above Canada and occasionally dips down over the United States.)

Most Metra passengers are commuters, going to work. A hair over 300,000 travel each weekday; service is drastically lowered on weekends and holidays, offering less than half the service of weekdays.

What if the organization of Metra, including all 2,500 employees in addition to the contracted railroad workers (let’s say 3,000 people), showed up to work with the same performance rating that their passengers experience?

First, Orseno – a career railroader who drives to work from Manhattan where a train comes leaves three times each day – would miss 11 work days of work each year (of 260 work days), based on their overall 95.8% on-time rating in 2012. Some routes are worse and others better. But collectively 3,000 people would miss 32,760 work days each year. That’s a lot of missed work.

Put another way, everybody – all 3,000 of them – is going to show up 20.16 minutes late to work because they’re missing 87.36 hours each year (of 2,080 hours they’re supposed to work and being 4.2% hours late). But again, I have no idea who’s working 8 hours and who’s working longer. (One of the problems Metra had during #Chiberia is that many workers hit the federally mandated limit and there weren’t always workers to take their place.)

Thankfully the Chicago Transit Authority, Pace, and ever-expanding highways and tollways are available to pick up the slack in Chicagoland’s transportation supply.

Another thing, this post is full of averages of averages, so it’s really imprecise. Today, Metra was reporting delays on a single train run of 16-100 minutes – a pretty broad estimate, but another train had a possible delay of 26-110 minutes. During the worst storm Metra experienced on January 5th and 6th, some train runs dumped passengers on platforms in subzero temperature.

Orseno reported today at the committee hearing that a “I don’t want to say middle-level” manager at Union Pacific made the call to dump the passengers. This has been “corrected” by only allowing a senior level staffer at Union Pacific make this call. Metra, which doesn’t have any performance-related incentives in its contracts with the freight railroads, apparently cannot stop this decision.

I’m waiting for the day when Metra is run like a transit system and not a railroad.

Note: I excluded vacation days because, well, no law requires organizations to offer paid or unpaid vacation days and there are probably several tiers of vacation-giving at Metra that I don’t know about.