Category: Chicago

Which places in Chicago get the most building permits?

View from the CTA green roof

The Merchandise Mart in the Near North Side community area ranks second place in locations receiving the most building permits.

Ed. note: I changed the title of this blog post because one interpretation of the original, “Where are the most building permits issued in Chicago?”, has the answer “City Hall”, the location of the issuer. My bad. 

Without regard to type or construction cost, the most building permits in the City of Chicago are issued at 11601 W Touhy Ave.

Where is that? It depends on which geocoder you use.

Two buildings at 11601 W Touhy Ave from Google Street View. The City of Chicago has issued thousands of building permits to this address, but the work is actually distributed across the O'Hare airport grounds. Google Maps and the Cook County parcel map places these buildings in Des Plaines.

Two buildings at 11601 W Touhy Ave from Google Street View. The City of Chicago has issued thousands of building permits to this address, but the work is actually distributed across the O’Hare airport grounds. Google Maps and the Cook County parcel map places these buildings in Des Plaines.

Google Maps puts it on this building that’s on a street called “Upper Express Drive” and in the city of Des Plaines, Illinois. But the City of Chicago wouldn’t issue building permits in another city.

Our own geocoder converts the geographic coordinates given in the city’s building permits database for these permits to the address “399 E Touhy Ave, Des Plaines, IL”. The Cook County parcel for the same location has the address “385 E Touhy Ave, Des Plaines, IL”.

Now where is this building?

It’s at O’Hare airport, and it’s one of a handful of addresses* the city’s buildings departments uses to denote permits issued to work at O’Hare. Since 2006 to Saturday, December 12, 2015, there’ve been 2,403 building permits issued here. The permits’ work descriptions indicate that a lot of the work occurs elsewhere on the airport grounds.

13 buildings have had more than 400 permits issued since 2006 to yesterday.

address community area count
11601 W Touhy Ave O’Hare

2403

222 W Merchandise Mart Plz Near North Side

802

141 W Jackson Blvd Loop

538

233 S Wacker Dr Loop

518

2301 S Lake Shore Dr Near South Side

516

30 S Wacker Dr Loop

510

5700 S Cicero Ave Garfield Ridge

495

500 W Madison St Near West Side

482

227 W Monroe St Loop

422

55 E Monroe St Loop

421

875 N Michigan Ave Near North Side

408

151 E Wacker Dr Loop

407

350 N Orleans St Near North Side

401

A pattern emerges: 10 of these 13 buildings are in the Central Business District and the other three are O’Hare airport, McCormick Place (2301 S Lake Shore Drive), and Midway airport (5700 S Cicero Ave).

The first location that’s outside the Central Business District and not one of the city’s airport or its convention center is at 1060 W Addison St – better known as Wrigley Field – in the Lake View community area with 321 building permits issued. It ranks #30. If you keep running down the list, the next most frequently issued location is 7601 S Cicero Ave – that’s the Ford City Mall and I think the city’s only sprawl-style indoor mall. It ranks #39 because it pulls monthly electric maintenance permits.

The Merchandise Mart’s position at #2 is notable because the majority of its permits are for small amounts of work: there is a lot of electrical rewiring done because of the frequent shows and exhibitions in the interior design materials “mall”.

The Mart sees other activity, though, including multi-million renovations for technology companies like Motorola Mobility and Braintree. The Mart also received a permit this year for a new $3 million staircase construction, part of its building-wide renovation project.

Rendering of new main (south) lobby staircase at the Merchandise Mart

This rendering shows a new grand staircase that will be built in the Merchandise Mart’s south lobby jutting from the side of the lobby that’s between the doors on the Chicago River side, and the reception desk and central elevator bank. A building permit issued this fall puts the construction cost at $3 million.

If you want to know more about building trends in Chicago, send me a message through the Chicago Cityscape website and I can put together a custom report for you.

* Other addresses I’ve noticed are:

  • 10000 N Bessie Coleman Dr
  • 10000 W Ohare St
  • 11600 W Touhy Ave
  • 11555 W Touhy Ave

Of these only the two Touhy Ave addresses are logical: O’Hare Street isn’t a real road, and 10000 N Bessie Coleman Dr is much further north than the northernmost point in Chicago.

How to use Chicago Cityscape’s upgraded names search tool

Search for names of people who do business in Chicago.

I created a combined dataset of over 2 million names, including contractors, architects, business names, and business owners and their shareholders, from Chicago’s open data portal, and property owners/managers from the property tax database. It’s one of three new features published in the last couple of weeks.

Type a person or company name in the search bar and press “search”. In less than 1 second you’ll get results and a hint as to what kind of records we have.

What should you search?

Take any news article about a Chicago kinda situation, like this recent Chicago Sun-Times article about the city using $8 million in taxpayer-provided TIF district money to move the Harriet Rees house one block. The move made way for a taxpayer-funded property acquisition on which the DePaul/McCormick Place stadium will be built.

The CST is making the point that something about the house’s sale and movement is sketchy (although I don’t know if they showed that anything illegal happened).

There’re a lot of names in the article, but here are some of the ones we can find info about in Chicago Cityscape.

Salvatore Martorina – an architect & building permit expeditor, although this name is connected to a lot of other names on the business licenses section of Cityscape

Oscar Tatosian – rug company owner, who owned the vacant lot to which the Rees house was moved

Bulley & Andrews – construction company which moved the house

There were no records for the one attorney and two law firms mentioned.

A century old former radium extraction site in Bronzeville gets building permit

Map of the Carnotite Reduction Company site near Bronzeville

The Carnotite Reduction Company site near Bronzeville. Map: OpenStreetMap

A recently-issued building permit on 26th Street just east of King Drive in the Prairie Shores neighborhood of the Near South Side community area (near Bronzeville) caught my eye.

Installation of temporary wood poles and aerial cable, to powering air monitors, for the Carnotite Reduction Company site project

Carnotite wasn’t a word I’ve heard before, and “Carnotite Reduction Company” isn’t a business I’ve heard of before, either.

I searched Bing and found that 4 of the 5 results were about cleaning up a contaminated site, and one of the results was a letter in PDF form hosted on the Centers for Disease Control and Prevention website prepared by a scientist at the Illinois Department of Public Health.

The letter is 11 pages long and tells the story about Carnotite Reduction Company, which had a factory in 1915 on what’s now known as the Michael Reese Hospital site, the buildings of which have all been demolished.

The Carnotite Co. mainly produced radium, along with some uranium and vanadium as byproducts.

The Carnotite Co. owned and operated mines in Colorado and Utah. In 1919, it was one of four companies that mined 95% of the carnotite ore produced in Colorado. The U.S. dominated the world radium market until 1922, when Belgium began using pitchblende ore from the Belgian Congo. The pitchblende was 40 to 100 times more pure than carnotite, and by 1923, Belgian competition ended carnotite ore processing in the U.S.

This article from the “Chicago Chemical Bulletin” publication in 1917 linked on the United States Environmental Protection Agency’s website about the cleanup project describes carnotite ore and mining process. They’ve cataloged this site as EPA ID# ILN000510371.

Chicago Chemical Bulletin: 1917 article about the Carnotite Reduction Company

The letter describes where radioactive, contaminated soil was found during boring tests made within the last three years, and how it potentially got there. The factory was extracting radium there, for an exploding cancer research trend, until 1920.

The company, the EPA believes, may have disposed its waste into public infrastructure.

The US Environmental Protection Agency (USEPA) suspects that the Carnotite Co. may have sent this liquid waste into the sewer, floor drains, or reintroduced it into the process for further refining. Because streets in the area, including Inglehart Court, were abandoned during the redevelopment in the 1950s and 1960s, sewers running along those abandoned streets likely also were abandoned. Other options for liquid waste disposal commonly used at the time included streams or ditches (with Lake Michigan in the vicinity), waste ponds, dug wells, and dumping wastes on porous ground (such as the sand on-site).

When the City of Chicago was preparing the site in 2009 for a potential Olympic Village for its 2016 Olympic Games bid – buying the property for an insane amount of cash and then razing it all, while eventually losing the bid to Rio de Janeiro – conducted “Phase I and Phase II environmental investigations” but didn’t survey for radiological contamination and didn’t uncover an important survey from 30 years prior.

The Illinois Department of Public Health found radioactive contamination after a “radiological surface survey” of the Michael Reese hospital site in 1979.

The IDPH Division of Radiological Health concluded that the contamination did not pose an immediate health threat, but should be taken into account before any future construction. In 1979, IDPH did not notify USEPA about the contamination they found.

The Illinois Emergency Management Agency surveyed the site in August 2009 and found the contamination, alerted the EPA, and met with the City of Chicago to discuss remediation.

The letter details further testing by AECOM, a global transportation, infrastructure, and engineering company, the levels of contamination, and risk assessment. It appears that the contamination won’t be a danger to most people.

The Illinois Department of Public Health concludes that exposure at the Carnotite Co. site to the area with the greatest surface radium and uranium concentration for 20 minutes per day, five days per week, 250 days per week, for 50 years is not expected to harm people’s health. IDPH considers this to be a maximum likely exposure scenario, given current conditions at the site.

It notes that a change in land use – the site is currently occupied by vacant hardscape, tennis courts, a park, sidewalks, and grassy areas – “could increase exposure duration”, especially if housing was built here.

The City of Chicago applied for a license in 2013 to temporarily store radioactive material on site before shipping it to a disposal facility. The EPA last updated its website in April 2014 to say that it was considering this application.

How Chicago accomplishes “not planning”

Bloomingdale Trail meeting

The Bloomingdale Trail planning process was the highest-quality I’ve experienced or witnessed. It’s an exception, and even then, it wasn’t integrated with any neighborhood or citywide plan to connect the trail to other networks of infrastructure. In essence, how people left or arrived to the path and parks wasn’t addressed. I expressed my pleasure at the process in 2011

A friend said to me recently, “Chicago’s whole being is based on not really having planning.” It’s the answer to a question us Chicago planners get from people around the country, typically regarding how the city controls the built environment. Zoning is really the only “tool” it gives itself in the absence of any citywide or neighborhood-level comprehensive plan.

Examples.

Doesn’t a new zoning code serve as a kind of plan?

It’s not a plan, and it’s a bad kind of planning because it doesn’t set goals or policies that could address the questions below (population loss, vacancies, parks and recreation). The city last revised its zoning code in 2004.

Using zoning as planning is made worse because, as mentioned in an example below, aldermen constantly “spot zone” by changing the zoning for one land parcel to something wildly different from the parcels that surround it. This doesn’t necessarily create incompatible land uses for the desired proposal (a brewery with a public taproom area in a traditional retail area would likely need a zoning change) but it creates unreliability as to the future of that street or neighborhood, because it subject to the whims of the alderman.

It needlessly complicates planning for developers’ business plans, and that of community development corporations who are trying to find land.

What’s the city’s plan for the lakefront museum, park, and trail system?

Accept the first proposal despite longstanding traditions and laws that are supposed to prevent new buildings between Lake Shore Drive and Lake Michigan. Even go a step further and change a law, at the state level, upon which a lawsuit opposing the Lucas Museum is based to remove the grounds for said lawsuit. Consider that the existing use is for tailgating on a surface parking lot and that the new use would be better (even though there’s a net positive number of parking spaces, and some of those parking spaces would be in the same space, but on grass outside the museum building). Don’t attempt to come up with alternative uses. Delay the release of a Museum Campus Transportation Plan.

What’s the city’s plan for vacant lots in high-demand neighborhoods?

Downzone it ahead of time so that the developer who wants to propose a non-conforming use has to come to the alderman to ask for a zoning change. What’s more likely to happen, and has happened many times over, is that a single-family home will be built. Next to a 24-hour train line.

What about these “corridor” or neighborhood-specific plans I’ve seen?

One of the strongest plans has been the Milwaukee Avenue Corridor Plan from 2008. The problem with these is that it was created by a previous alderman using different ward boundaries, so the current alderman (or more than one!) have no obligation to follow it. But they do have an incentive: many people who participated in creating that plan still live there, and care more about the street than they do what ward boundaries cut across it.

What’s the city’s plan to deal with 50 public schools it closed?

Deal with them one by one, after their closures, as time and resources allow.

What’s the city’s plan to rebuild its population?

A massive portion of the loss of 200,000 people from 2000 to 2010 was the loss of public housing units. The Chicago Housing Authority, which is separate from the City Council’s governance, has $400 million in its bank account and has replaced only a few thousand public housing units. You could say it’s about a decade behind on its plan to restore public and affordable housing units. Two other regulations (revised ARO and TOD ordinances) are attempting to build more affordable housing but will not make as much of a dent as the CHA doing its job.

The city is seeing more and more high-end residential construction concentrated in the Loop, South Loop, and Near North Side, areas that were already seeing growth during the 2008+ recession.

What other examples are out there?

The new CTA budget

[I published an edited version of this post on Streetsblog Chicago.]

The Chicago Transit Authority gleefully tweeted that “fares [will] stay the same” and they’ll continue to “maintain/improve existing services”.

There are so many points to be made.

The medium on which they sent this message is irrelevant because Mayor Rahm Emanuel will parrot this at his press conference this afternoon at the Addison Blue Line station. He’ll say something that he’s holding fares down in order to support working families, yet he (because he runs the agency) can still get projects done, like renovating the Addison station to be accessible.

Fares should go up frequently, instead of making big jumps every 3-5 years. The price of things changes much more frequently and it’s what an agency providing such an important transportation service needs to do to be less constrained in making buses and trains run. And planning and funding for more buses and trains, under the strain of growing ridership. The CTA has the expertise to develop a long-term plan that sets out fare increases annually, removing the surprise, “Will this be the year?”

Fares should go up in increments smaller than quarters of a dollar! 0.25, 0.50, 0.75, and 1.00 are not the only choices available. Requiring riders who pay in cash – who become rarer each day – to pay with dollar bills and quarters isn’t a “convenience”, it’s annoying. It gives the CTA less flexibility in settling on the right price, and it means I can’t use these dimes and nickels that are piling on my nightstand. Quarters are for laundry.

“Fares will stay the same” is what Emanuel said two years ago when the price of passes was increased. Apparently causing people to spend more money to ride the train the same amount of times, if they have passes, is not a fare increase. This year none of the prices are changing. Hiking pass prices and keeping the base fare (single rides + transfers) the same can still hurt a low income rider: it puts the discounted fare further out of reach. Many Chicagoans are unable to put down $25 at a time for a ticket that would pay for all of their rides that week, so they pay per use, and end up paying more.

What holding the line on fare increases does is detrimental to riders and to CTA workers. It continues to defer fixing the problem of underfunded transit. The CTA, and its fellow transportation providers, Metra and Pace, are unable to pay for what people need them to do.

Additionally it’ll mean that, in order to keep costs in check, the CTA might freeze wages again. Because professionals providing Chicagoans with quality transportation services are the city’s and state’s piggy bank, and should sacrifice their wages due to “hard times”.

That’s the problem to be dealt with “soon”, but there’s an immediate problem, that Jon Hilkevitch explains in the Tribune:

The governor and lawmakers in Springfield have not agreed on a 2016 budget and the state still owes the CTA $221 million in capital-improvement funding that was expected in 2015, transit officials said.

But hey, “air quality” money is going to pay $18 million to widen a bunch of intersections so people can drive faster through them – until more people switch to driving through that fast intersection.